Browsing Geothermal by Subject "Cables, Submarine--Hawaii"

Sort by: Order: Results:

Now showing items 1-20 of 47

Next Page
  • Makai Ocean Engineering, Inc. (Makai Ocean Engineering, Inc., 1987-07-07)
    Objectives of study. To review and analyze Seafloor Surveys, Inc. bathymetry data in determining the feasibility of laying a cable from Maui to Oahu. To identify an acceptable path if possible. When applicable, identify ...
  • (Northwest Economic Associates, 1990-03-01)
    In early 1989 the Pele Defense Fund requested that Northwest Economic Associates (NEA) update their 1987 economic analysis of the proposed Hawaii Geothermal Development And Inter-island Cable Transmission System Project. ...
  • Quinn, William F. ([n.p.], 1988-06)
    "For the Social Science Association, Monday, June 6, 1988."
  • Wilkins, George (ASME Energy-Sources Technology Conferences, 1987-02)
    "An evaluation is made of non-optical roles that optical fibers can play in improving the performance of deepsea tether cables. Here, 'improvement' is defined in the context of compromises that must be made among conflicting ...
  • Quinn, William F. (Governor's Advisory Board on the Underwater Cable Transmission Project, 1988-01-15)
    "The Cable Board has reached tentative conclusions that geothermal development and underwater cable transmission are technically, economically, financially and socially feasible. It is too early to determine whether the ...
  • Thermal Power Company, Diamond Shamrock (Thermal Power Company, Diamond Shamrock, 32023)
    Sections: PGV 25MW Project, Project Description, Geothermal Power in Hawaii, Location and Description of Geothermal Resources, Geothermal Wells and Wellfield Facilities, Power Production, Pollution Abatement and Hazard ...
  • Pirelli Cable Corporation and Societa Cavi Pirelli (Pirelli Cable Corporation and Societa Cavi Pirelli, 1986-03)
    The scope of this study is to determine the short term overload capability of Cable No. 116 in the event of the loss of one pole of the dc transmission system. Such a loss would result in the loss of 250 MW of transmitted ...
  • Pirelli Cable Corporation and Societa Cavi Pirelli (Pirelli Cable Corporation and Societa Cavi Pirelli, 1986-04)
    This document incorporates listings of the testing and measuring equipment to be used in the performance of the mechanical and electrical tests described in the January 23, 1986 draft of the Laboratory Test Protocol, ...
  • Department of Planning and Economic Development, State of Hawaii (Department of Planning and Economic Development, State of Hawaii, 1986-01)
    Background information sheets about the Hawaii Deep Water Cable Program
  • Dillingham Corporation (Dillingham Corporation, 1989-11-10)
    This document describes the equipment and operations planned for the At-Sea Test Phase of the Hawaii Deep Water Cable Program. This phase is being performed by Dillingham Construction Pacific, LTD. (Dillingham) of Honolulu, ...
  • Makai Ocean Engineering, Inc.; Edward K. Noda & Associates; Hawaii Institute of Geophysics (Makai Ocean Engineering, Inc. / Ed Noda & Associates / Hawaii Institute of Geophysics, 1986-05-01)
    The Hawaii Deep Water Cable Program is responsible for determining the feasibility of laying multiple power cables between the islands of Hawaii and Oahu in the Hawaiian Islands. One major obstacle identified early in the ...
  • Makai Ocean Engineering, Inc.; Edward K. Noda & Associates (Makai Ocean Engineering Inc. / Edward K. Noda & Associates, 1988-11-15)
    This report describes the Integrated Control System (ICS), the Data Acquisition System (DAS) and data collection systems presently being completed for the At-Sea Test phase of the Hawaii Deep Wlater Cable Program. Two ...
  • Hawaiian Electric Company (Hawaiian Electric Company, 1990-09-01)
    The Hawaii Deep Water Cable Program has succeeded unequivocally in determining the feasibility of deploying a submarine power cable system between the islands of Hawaii and Oahu. Major accomplishments of the program include ...
  • The Ralph M. Parsons Company DBA Parsons Hawaii (The Ralph M. Parsons Company DBA Parsons Hawaii, 1985-05)
    The cable selection task is another step towards accomplishing the goals and objectives of the Hawaii Deep Water Cable (HDWC) Program. The primary purpose of this task is the selection of a cable that best meets the Program's ...
  • State of Hawaii. Department of Planning and Economic Development (State of Hawaii Department of Planning and Economic Development, [1984?])
    This Executive Summary for the Hawaii Deep Water Cable (HDWC) Program summarizes the state-funded Phase II-A work that has been performed; indicates the interrelationships of the state- and federally-funded portions of the ...
  • Larsen-Basse, J. (Hawaii Natural Energy Institute, University of Hawaii at Manoa, 1984-04)
    Phase II-A, Task 3 deep water electrical cable corrosion testing. Initial results from a study of the behavior of some typical and some candidate deep sea cable materials under Hawaiian conditions are presented. The effort ...
  • Mansur, J.; Krasnick, G. (Parsons Hawaii, 1986-04)
    This Executive Summary for the Hawaii Deep Water Cable (HDWC) Program reviews work-to-date on the Program emphasizing the recently completed State-funded, Phase II-B tasks. This report also describes the interrelationships ...
  • Pirelli Cable Corporation and Societa Cavi Pirelli (Pirelli Cable Corporation and Societa Cavi Pirelli, 1986-05)
    The "catenary" study for the Hawaii Deep Water cable (HDWC) Program is applicable to the environmental conditions that cable No. 116 will experience at the bottom of the Alenuihaha Channel. Based on the present limited ...
  • Pirelli Cable Corporation (Pirelli Cable Corporation, 1985-09)
    This document constitutes a detailed construction specification covering the design, fabrication and testing of the preferred 250 MW dc self contained oil filled (SCOF) cable to be used for the laboratory and possibly ...
  • Western Gear Machinery Co. (Western Gear Machinery Co., 1986-01)
    In this Cable Handling Equipment Concepts study, the HDWC program at-sea test requirements of high cable tension and increased sea states were evaluated against present state-of-the-art cable handling equipment to formulate ...

Now showing items 1-20 of 47

Next Page

Search


Advanced Search

Browse

My Account

About