Browsing "The Geothermal Collection" by Title

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z


 


Showing results 630 to 649 of 1459 < previous   next >
Issue DateTitleAuthor(s)
Sep-1985Hawaii Deep Water Cable Program phase II : Cable construction specificationPirelli Cable Corporation
1984Hawaii Deep Water Cable Program phase II-A : Executive summaryState of Hawaii. Department of Planning and Economic Development
Apr-1986Hawaii Deep Water Cable Program phase II-B : Executive summaryMansur, J.; Krasnick, G.
Aug-1987Hawaii Deep Water Cable Program Phase II-CKrasnick, G.; Mansur, J.
1987Hawaii Deep Water Cable Program presentation slides-
May-1986Hawaii Deep Water Cable Program, phase II : Cable catenary studyPirelli Cable Corporation and Societa Cavi Pirelli
Jan-1986Hawaii Deep Water Cable Program, phase II : cable handling equipment concept studyWestern Gear Machinery Co.
Mar-1986Hawaii Deep Water Cable Program, phase II : cable vessel subsystem feasibility criteria-
Mar-1986Hawaii Deep Water Cable Program, phase II : conceptual design study : integrated control system for the HDWC cable layingMakai Ocean Engineering, Inc.
Nov-1986Hawaii Deep Water Cable Program, phase II : High frequency wave analysis for the Alenuihaha ChannelEdward K. Noda & Associates
May-1986Hawaii Deep Water Cable Program, phase II : Laboratory test protocolPirelli Cable Corporation and Societa Cavi Pirelli
Jul-1986Hawaii Deep Water Cable Program, phase II : wind characteristics and general relationship between trade wind speeds and wave heights in the Alenuihaha Channel : final reportPacific Weather, Inc.
Oct-1986Hawaii Deep Water Cable Program, phase II-B, task 3 : cable materials corrosion and abrasion testingLarsen-Basse, J.
Aug-1987Hawaii Deep Water Cable Program, phase II-C : Executive summaryKrasnick, G.; Mansur, J.
Mar-1987Hawaii Deep Water Cable Program, phase II-C task 4 : Second bottom roughness surveyMakai Ocean Engineering, Inc.; Scripps Institution of Oceanography
Apr-1988Hawaii Deep Water Cable Program, phase II-C task 5 : Overland transmission line corridor study Puna to Kohala, Island of HawaiiDHM Planners, Inc.
Jul-1987Hawaii Deep Water Cable Program, phase II-C task 5 : Submarine vs. overhead routing : A cost comparision for MolokaiKrasnick, G.; Mansur, J.
Nov-1986Hawaii Deep Water Cable Program, phase II-C task 8.4 : Environmental design criteria for cable deployment operations in the Alenuihaha ChannelEdward K. Noda & Associates
May-1987Hawaii Deep Water Cable Program, phase II-C, task 1 : environmental contraints to use of a sea electrode in a submarine transmission cable system in HawaiiKransnick, George
Apr-1987Hawaii Deep Water Cable Program, phase II-C, task 1 : hydrogen sulfide in sediments along the preferred submarine cable routeKrasnick, George