Chen, Bill H; Lopez, Louis P; Kuwada, James T; Farrington, Ray J
(Research Corporation of the University of Hawaii / Rogers Engineering Co., Inc., 1980-09)
The HGP-A Well underwent a substantial workover last fall. A new tie-back 7" casing was installed from surface to 3,000 ft. A two-week test was conducted in January, 1980, with full hydrogen sulfide and noise abatement. ...