Environmental review, 500 MW geothermal development : preliminary draft : technical description and environmental setting

Date
1988-12-12
Authors
MCM Planning
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
MCM Planning
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The State of Hawaii anticipates that by the year 2007 up to 500 deliverable megawatts (MW or MWe) of geothermally-generated electricity would be needed for transmission from the island of Hawaii to the islands of Maui (up to 50 megawatts) and Oahu via an interisland cable system. For this environmental review, the areas considered as potential sources of this power are the three geothermal resources subzones (GRS) within the Kilauea East Rift Zone on the Big Island of Hawaii. Specifically, they are: (1) the Kilauea Middle East Rift GRS; (2) the Kamaili section of the Kilauea Lower East Rift GRS; and, (3) the Kapoho Section of the Kilauea Lower East Rift GRS.
Description
Keywords
Puna, Kilauea, Big Island, Hawaii Island, Hawaii, Geothermal resources--Environmental aspects--Hawaii--Kilauea (Hawaii Island), Geothermal resources--Environmental aspects--Hawaii--Puna, Environmental impact analysis--Hawaii--Kilauea (Hawaii Island), Environmental impact analysis--Hawaii--Puna
Citation
MCM Planning. 1988. Environmental review, 500 MW geothermal development: preliminary draft: technical description and environmental setting. Honolulu (HI): MCM Planning.
Extent
458 pages
Format
Geographic Location
Time Period
Related To
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.