Please use this identifier to cite or link to this item: http://hdl.handle.net/10524/33657

Information Bulletin: Drilling Resumption at Puna Geothermal Venture

File SizeFormat 
1992 - Drilling Resumption at Puna.pdf829.02 kBAdobe PDFView/Open

Item Summary

Title: Information Bulletin: Drilling Resumption at Puna Geothermal Venture
Keywords: impacts
outreach
emissions
media
Puna
show 1 moreHawaii
show less
Issue Date: Mar 1992
Publisher: County of Hawaii, State of Hawaii
Citation: County of Hawaii, State of Hawaii. March 1992. Information Bulletin: Drilling Resumption at Puna Geothermal Venture. Hawaii: County of Hawaii, State of Hawaii.
Abstract: Information Bulletin publishd by the County of Hawaii and State of Hawaii on March 1992. After meeting the terms and conditions of a major overhaul on drilling, safety requirements and enforcement, Puna Geothermal Venture (PGV) has received permission to complete its 25-megawatt electric power plant in Kapoho. The new criteria were issued in a Geothermal Management Plan prepared by a joint County-State task force. The plan tightens drilling requirements. improves emergency response procedures, improves emission requirements for hydrogen sulfide and noise, upgrades monitoring equipment and adds staff to ensure enforcement.
Pages/Duration: 5 pages
URI/DOI: http://hdl.handle.net/10524/33657
Appears in Collections:County of Hawaii
The Geothermal Collection



Items in eVols are protected by copyright, with all rights reserved, unless otherwise indicated.