Preliminary feasibility of an undersea cable linking Molokai and Maui

Date
1983-12
Authors
CH2M Hill
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
CH2M Hill
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The purpose of this preliminary feasibility study of an undersea cable linking Molokai and Maui is to explore in greater detail the feasibility of such a cable. CH2M HILL's previous study, "A Prelimiary Overview of Power Supply Alternatives for Molokai," concluded that an undersea cable could provide the lowest cost power to Molokai, assuming the cost of the cable was supported by electric ratepayers on both Molokai and Maui. This study further address the technical feasibility of a cable, the availability of a power supply from Maui, the possible methods of financing the cable, and the economics of the cable.
Description
Keywords
Hawaii Deep Water Cable Program, cable, demonstration, feasibility, Maui, Molokai, Cables, Submarine--Hawaii, Electric power transmission--Hawaii, Electric lines--Hawaii, Electric cables, Underground electric lines--Hawaii
Citation
CH2M Hill. 1983. Preliminary feasibility of an undersea cable linking Molokai and Maui. CH2M Hill.
Extent
28 pages
Format
Geographic Location
Time Period
Related To
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.