Please use this identifier to cite or link to this item: http://hdl.handle.net/10524/36047

Hawaii Deep Water Cable Program : Phase II reassessment of cable vessel availability

Item Summary

Title: Hawaii Deep Water Cable Program : Phase II reassessment of cable vessel availability
Authors: Lopez, L.
McHale F.
Keywords: cable
demonstration
deployment
ship
Hawaii
LC Subject Headings: Cables, Submarine--Hawaii
Electric power transmission--Hawaii
Electric lines--Hawaii
Electric cables
Underground electric lines--Hawaii
Issue Date: Dec 1983
Publisher: Hawaiian Dredging and Construction Company
Citation: Lopez L, McHale F. 1983. Hawaii Deep Water Cable Program: Phase II reassessment of cable vessel availability. (HI): Hawaiian Dredging and Construction Company.
Abstract: The report, "Preliminary Cable Vessel Ship Inventory and Capabilities," summarized a survey of existing cable vessels to determine their applicability and availability to the HDWC Program. This report concluded that none of the existing vessels were applicable to the program without major modifications to the cable handling equipment. As a result of technical discussions with Parsons, HECO and DOE, HD&C was requested to reassess the applicability and availability of the most likely candidate cable vessels.
Pages/Duration: 40 pages
URI/DOI: http://hdl.handle.net/10524/36047
Appears in Collections:Department of Business, Economic Development and Tourism
The Geothermal Collection



Items in eVols are protected by copyright, with all rights reserved, unless otherwise indicated.