Laboratory testing of a HVDC submarine power cable for the Hawaii Deep Water Cable Program

Date
1986-05-14
Authors
Bonnet, William A.
Garrity, Thomas F.
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Hawaiian Electric Company, Inc.
Ebasco Services Incorporated
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The objective of the Hawaii program is to prove the technical feasibility of a commercial submarine power cable system between the islands of Hawaii and Oahu. This represents almost four times the depth and twice the length of present state-of-the-art installations. Although at-sea testing will be required to verify system management of mechanical loade and insure requisite accuracy of placement, the mechanical, thermal and electrical capabilities of the self-contained oil-filled cable design will be fully characterized in the laboratory with 6,000 feet of test cable. The laboratory program, the rationale behind its development, and its relationship to other elements of the Hawaii Deep Water Cable Program are described.
Description
Keywords
Hawaii Deep Water Cable Program, demonstration, engineering, testing, Hawaii, Cables, Submarine--Hawaii, Electric power transmission--Hawaii, Electric lines--Hawaii, Electric cables, Underground electric lines--Hawaii
Citation
Bonnet WA, Garrity TF. 1986. Laboratory testing of a HVDC submarine power cable for the Hawaii Deep Water Cable Program. Hawaiian Electric Company, Inc., and Ebasco Services Incorporated.
Extent
37 pages
Format
Geographic Location
Time Period
Related To
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.