Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line

Item Summary

Title:Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line
Authors:Murabayashi, Duk Hee
Keywords:Hawaii Island
transmission lines
Pohoiki
Keaau
Kilauea
show 4 morePuna
Big Island
Hawaii
Kilauea East Rift Zone
show less
LC Subject Headings:Electric lines--Environmental aspects--Hawaii--Puna
Environmental impact statements--Hawaii
Geothermal resources--Environmental aspects--Hawaii--Puna Region
Environmental impact analysis--Hawaii--Puna
Land use--Environmental aspects--Hawaii--Puna
Date Issued:10 Sep 1987
Publisher:DHM Planners, Inc.
Citation:Murabayashi DH. 1987. Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line. Honolulu (HI): DHM Planners, Inc.
Abstract:"Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power plant at Pohoiki to the vicinity of the Puna Substation in Keaau, Hawaii. It is estimated that the length of each transmission line would be 16 to 18 miles.
The transmission lines would be constructed in two phases; the first by late 1989 and the second line to be completed by 1993.
An Environmental Impact Statement for a two-unit 25 MW (megawatt) geothermal electric power plant, which is the source of power to be transmitted, is being prepared separately by the Puna Geothermal Venture."
Pages/Duration:18 pages
URI/DOI:http://hdl.handle.net/10524/47944
Appears in Collections: Department of Land and Natural Resources
The Geothermal Collection


Please email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.

Items in eVols are protected by copyright, with all rights reserved, unless otherwise indicated.