Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line

Item Summary

Title: Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line
Authors: Murabayashi, Duk Hee
Keywords: environmental impact assessment
environmental impact analysis
environmental aspects
EIS
transmission line
show 8 morePohoiki
Keaau
Kilauea
Puna
Big Island
Hawaii
Kilauea East Rift Zone
KERZ

show less
Issue Date: 10 Sep 1987
Publisher: DHM Planners Inc.
Citation: Murabayashi DH. 1987. Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line. Honolulu (HI): DHM Planners Inc.
Abstract: "Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power plant at Pohoiki to the vicinity of the Puna Substation in Keaau, Hawaii. It is estimated that the length of each transmission line would be 16 to 18 miles.
The transmission lines would be constructed in two phases; the first by late 1989 and the second line to be completed by 1993.
An Environmental Impact Statement for a two-unit 25 MW (megawatt) geothermal electric power plant, which is the source of power to be transmitted, is being prepared separately by the Puna Geothermal Venture."
Pages/Duration: 18 pages
URI/DOI: http://hdl.handle.net/10524/47944
Appears in Collections:Department of Land and Natural Resources
The Geothermal Collection