Venting/testing KS-8

Date
1991-06
Authors
Puna Geothermal Venture
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Puna Geothermal Venture
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
From cover letter: "Puna Geothermal Venture is planning to run a 24-hour rig test of well KS-8 which is currently being drilled (Figure 1). This rig test will consist of flowing KS-8 with the drill rig on the well. The test will take place on or shortly after June 24, 1991. The rig test program (Attachment A) is attached for your review. The Pursuant to Condition No. 18 of the Authority to Construct No. A-833-795 for Puna Geothermal Venture (PGV) , PGV is required to submit a chemical treatment plan for abatement of H2S during flow testing. The chemical treatment plan used for the flow testing of KS-3 will be used for the KS-8 rig test and will be implemented using the same test facility (Figure 2). A copy of that program is attached (Attachment B). The treatment plan for KS-3, which was reviewed by your staff, proved to be highly effective in maintaining H2S emmission levels well below permit limits."
Description
Keywords
KS-8, Puna Geothermal Venture, well testing, well monitoring, venting, Hawaii, Big Island, Puna, Kilauea
Citation
Puna Geothermal Venture. 1991. Venting/testing KS-8. Hilo (HI): Puna Geothermal Venture.
Extent
22 pages
Format
Geographic Location
Time Period
Related To
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.