Please use this identifier to cite or link to this item: http://hdl.handle.net/10524/48001

KS-1A testing and inspection

File Size Format  
1991 - KS 1-A Testing and Inspection.pdf 6.93 MB Adobe PDF View/Open

Item Summary

Title:KS-1A testing and inspection
Authors:Puna Geothermal Venture
Keywords:KS-1A
Puna Geothermal Venture
Underground Injection Control
regulatory
permits
show 10 morepermitting
well monitoring
geothermal fluids
well testing
Kapoho
Hawaii Island
Kilauea
Puna
Big Island
Hawaii
show less
Date Issued:Nov 1991
Publisher:Puna Geothermal Venture
Citation:Puna Geothermal Venture. 1991. Puna Geothermal Venture Project Underground Injection Control (UIC) : UIC application no. UH-1529. Hilo (HI): Puna Geothermal Venture.
Abstract:"Pursuant to the Authority to Construct Underground Injection Wells issued to Puna Geothermal Venture (PGV) by the State Department of Health on March 16, 1990 in the form of a letter, PGV respectfully submits the following documentation for your review and approval:
1. Production and Injection Well Casing Monitoring Program, dated November 21, 1991;
2. KS-3 Testing and Inspection program, dated November 21, 1991; and
3. KS-1A Testing and Inspection program, dated November 21, 1991.
The acceptance of these reports, along with the geologic report and the Hydrologic Monitoring program, constitute the completion of requirements for a Permit to Operate injection wells KS-IA and KS-3 under the UIC."
Pages/Duration:22 pages
URI/DOI:http://hdl.handle.net/10524/48001
Appears in Collections: Department of Health Documents
The Geothermal Collection


Please email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.

Items in eVols are protected by copyright, with all rights reserved, unless otherwise indicated.