Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line

Date
1987-09-10
Authors
Murabayashi, Duk Hee
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
DHM Planners, Inc.
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
"Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power plant at Pohoiki to the vicinity of the Puna Substation in Keaau, Hawaii. It is estimated that the length of each transmission line would be 16 to 18 miles. The transmission lines would be constructed in two phases; the first by late 1989 and the second line to be completed by 1993. An Environmental Impact Statement for a two-unit 25 MW (megawatt) geothermal electric power plant, which is the source of power to be transmitted, is being prepared separately by the Puna Geothermal Venture."
Description
Keywords
Hawaii Island, transmission lines, Pohoiki, Keaau, Kilauea, Puna, Big Island, Hawaii, Kilauea East Rift Zone, Electric lines--Environmental aspects--Hawaii--Puna, Environmental impact statements--Hawaii, Geothermal resources--Environmental aspects--Hawaii--Puna Region, Environmental impact analysis--Hawaii--Puna, Land use--Environmental aspects--Hawaii--Puna
Citation
Murabayashi DH. 1987. Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line. Honolulu (HI): DHM Planners, Inc.
Extent
18 pages
Format
Geographic Location
Time Period
Related To
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.