The HGP-A Geothermal Wellhead Generator Facility, located on the Lower East Rift Zone of Kilauea Volcano, was installed as a pilot project to demonstrate the technical feasibility of producing electrical power from the geothermal reservoir discovered by the HGP-A research well in 1976. The electrical generation facility was installed in June, 1981 and, after a number of initial startup problems, began commercial operation in March 1982; it has now been in operation for nearly 40 months. During this period a number of changes have occurred in the well fluid chemistry that have yielded insight into the character of the geothermal reservoir associated with the East Rift Zone and have identified a number of potential facilities that may be installed on this reservoir.

Description

Keywords

Hawaii Geothermal Project, production, reservoirs, chemical analysis, power generation, Puna, Hawaii

Citation

Thomas D. The HGP-A generator facility: Reservoir characteristics and operating history: EPRI research project 1195-12. Honolulu (HI): Hawaii Institute of Geophysics, University of Hawaii at Manoa.

Extent

7 pages

Format

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Local Contexts

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.