Plugging procedures and suspension of drilling operations for injection well KS-7
Loading...
Date
Authors
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Interviewee
Narrator
Transcriber
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Puna Geothermal Venture
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
"During the drilling of injection well KS-7, the Puna Geothermal Venture has encountered a high temperature, high pressure zone at depth of 1600'. This zone caused the fluid and steam release on the afternoon of February 21, 1991. Since that time the well has been shut in and is being kept in a stable condition by continuous pumping of cold water into the well bore. During this period equipment and personnel were assembled in order to plug the well. PGV is hereby requesting authorization to execute plugging and monitoring operations that we feel are required to bring the well to a stable and safe condition for the long term. This program is described in the attached document and figures."
Description
Citation
Puna Geothermal Venture. 1991. Plugging procedures and suspension of drilling operations for injection well KS-7. Hilo (HI): Puna Geothermal Venture.
DOI
Extent
5 pages
Format
Geographic Location
Time Period
Related To
Related To (URI)
Table of Contents
Rights
Rights Holder
Catalog Record
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.
