"Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power plant at Pohoiki to the vicinity of the Puna Substation in Keaau, Hawaii. It is estimated that the length of each transmission line would be 16 to 18 miles. The transmission lines would be constructed in two phases; the first by late 1989 and the second line to be completed by 1993. An Environmental Impact Statement for a two-unit 25 MW (megawatt) geothermal electric power plant, which is the source of power to be transmitted, is being prepared separately by the Puna Geothermal Venture."

Description

Citation

Murabayashi DH. 1987. Environmental assessment / preparation of an environmental impact statement : Pohoiki geothermal transmission line. Honolulu (HI): DHM Planners, Inc.

Extent

18 pages

Format

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Catalog Record

Local Contexts

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.