Hawaii Deep Water Cable Program, phase II : conceptual design study : integrated control system for the HDWC cable laying

Date

1986-03

Contributor

Advisor

Department

Instructor

Depositor

Speaker

Researcher

Consultant

Interviewer

Narrator

Transcriber

Annotator

Journal Title

Journal ISSN

Volume Title

Publisher

Makai Ocean Engineering, Inc.

Volume

Number/Issue

Starting Page

Ending Page

Alternative Title

Abstract

The Hawaii Deep Water Cable Program has been established to evaluate and resolve the technical problems associated with laying a power cable from the island of Hawaii to the island of Oahu in the State of Hawaii. This cable, 250km (150m) long, is to be laid at a maximum depth of 2135m (7000ft) under design seas of 2.5m (8ft) and surface currents up to 1.5m/s (3kts). One of the many problems associated with this task is the integrated control system for the deployment vessel, the subject of this study. The intent of this study is to provide a conceptual design for an integrated control system that identifies its basic method of operation, equipment required, and to determine potential problem areas. The main objective of the control system is to promptly lay the cable on the bottom, properly tensioned and properly located. In general, this is achieved by accurately measuring a variety of cable and vessel parameters, monitoring the vessel location and controlling the cable payout rate and the vessel position. In conclusion, a control system that can properly position and tension the cable for the Hawaii program is possible. Most of the components for the system are commercially available with the exception of the surface cable angle measurement. The cable lay and control will involve added complexities because of the depth, cable dynamics, path width and bottom slopes; these should be tested in the HDWC demonstration program.

Description

Keywords

Hawaii Deep Water Cable Program, cable, demonstration, deployment, ship, Hawaii, Electric cables, Cables, Submarine--Hawaii, Electric power transmission--Hawaii, Electric lines--Hawaii, Underground electric lines--Hawaii

Citation

Makai Ocean Engineering, Inc. 1986. Hawaii Deep Water Cable Program, phase II: conceptual design study: integrated control system for the HDWC cable laying. Honolulu (HI): Makai Ocean Engineering, Inc.

Extent

207 pages

Format

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Local Contexts

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.