Hawaii Deep Water Cable Program phase II : cable construction specification

Date

1985-09

Contributor

Advisor

Department

Instructor

Depositor

Speaker

Researcher

Consultant

Interviewer

Narrator

Transcriber

Annotator

Journal Title

Journal ISSN

Volume Title

Publisher

Pirelli Cable Corporation

Volume

Number/Issue

Starting Page

Ending Page

Alternative Title

Abstract

This document constitutes a detailed construction specification covering the design, fabrication and testing of the preferred 250 MW dc self contained oil filled (SCOF) cable to be used for the laboratory and possibly at-sea portions of the U.S. Department of Energy Hawaii Deep Water Cable (HDWC) Program. All cable materials, components, details of cable fabrication and test requirements are fully described. This specification incorporates a level of technical detail sufficient to permit an experience cable manufacturer to produce a length of cable.

Description

Keywords

Hawaii Deep Water Cable Program, cable, demonstration, engineering, cable design, Hawaii, Cables, Submarine--Hawaii, Electric power transmission--Hawaii, Electric lines--Hawaii, Electric cables, Underground electric lines--Hawaii, Underground electric lines--Hawaii

Citation

Pirelli Cable Corporation. 1985. Hawaii Deep Water Cable Program phase II: Cable construction specifications. Pirelli Cable Corporation.

Extent

38 pages

Format

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Local Contexts

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.