Hawaii Deep Water Cable Program phase II : cable construction specification
Date
1985-09
Authors
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Narrator
Transcriber
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Pirelli Cable Corporation
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
This document constitutes a detailed construction specification covering the design, fabrication and testing of the preferred 250 MW dc self contained oil filled (SCOF) cable to be used for the laboratory and possibly at-sea portions of the U.S. Department of Energy Hawaii Deep Water Cable (HDWC) Program. All cable materials, components, details of cable fabrication and test requirements are fully described. This specification incorporates a level of technical detail sufficient to permit an experience cable manufacturer to produce a length of cable.
Description
Keywords
Hawaii Deep Water Cable Program, cable, demonstration, engineering, cable design, Hawaii, Cables, Submarine--Hawaii, Electric power transmission--Hawaii, Electric lines--Hawaii, Electric cables, Underground electric lines--Hawaii, Underground electric lines--Hawaii
Citation
Pirelli Cable Corporation. 1985. Hawaii Deep Water Cable Program phase II: Cable construction specifications. Pirelli Cable Corporation.
Extent
38 pages
Format
Geographic Location
Time Period
Related To
Related To (URI)
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.