Venting/testing KS-8

dc.contributor.author Puna Geothermal Venture
dc.date.accessioned 2015-07-06T23:49:20Z
dc.date.available 2015-07-06T23:49:20Z
dc.date.issued 1991-06
dc.description.abstract From cover letter: "Puna Geothermal Venture is planning to run a 24-hour rig test of well KS-8 which is currently being drilled (Figure 1). This rig test will consist of flowing KS-8 with the drill rig on the well. The test will take place on or shortly after June 24, 1991. The rig test program (Attachment A) is attached for your review. The Pursuant to Condition No. 18 of the Authority to Construct No. A-833-795 for Puna Geothermal Venture (PGV) , PGV is required to submit a chemical treatment plan for abatement of H2S during flow testing. The chemical treatment plan used for the flow testing of KS-3 will be used for the KS-8 rig test and will be implemented using the same test facility (Figure 2). A copy of that program is attached (Attachment B). The treatment plan for KS-3, which was reviewed by your staff, proved to be highly effective in maintaining H2S emmission levels well below permit limits."
dc.format.extent 22 pages
dc.identifier.citation Puna Geothermal Venture. 1991. Venting/testing KS-8. Hilo (HI): Puna Geothermal Venture.
dc.identifier.uri http://hdl.handle.net/10524/47990
dc.language.iso en-US
dc.publisher Puna Geothermal Venture
dc.subject KS-8
dc.subject Puna Geothermal Venture
dc.subject well testing
dc.subject well monitoring
dc.subject venting
dc.subject Hawaii
dc.subject Big Island
dc.subject Puna
dc.subject Kilauea
dc.title Venting/testing KS-8
dc.type Report
dc.type.dcmi Text
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
1991 - Venting or Testing KS-8.pdf
Size:
6.96 MB
Format:
Adobe Portable Document Format
Description: